Cord (80 cubic ft) Conversion Factors - Volume - Lumber

All Volume - Lumber Conversion Tables

Sort: Logical Groups
Convert what? (default is 1)
   

Measurement Calculator:     Volume - Lumber Conversions

Choose Category

   
  Quantity     Reference Unit     is equal to     Conversion Factor     Unit  
1cord (80 cubic ft) = 0.96  1000 board feet
1 = 1.92  1000 square feet (1/2-inch panels)
1 = 3.84  1000 square feet (1/4-inch panels)
1 = 7.68  1000 square feet (1/8-inch panels)
1 = 1.28  1000 square feet (3/4-inch panels)
1 = 2.56  1000 square feet (3/8-inch panels)
1 = 960  board feet
1 = 0.625  cord
1 = 1  cord (80 cubic ft)
1 = 5  cord feet
1 = 24  cross tie
1 = 80  cubic feet
1 = 138240  cubic inch
1 = 2.26534772736  cubic meter
1 = 0.8  cunit
1cord (80 cubic ft) = 56.470588235294  pallet
1 = 15.238095238095  switch tie

   
  Quantity     Unit     is equal to     Conversion Factor     Reference Unit  
11000 board feet = 1.0416666666667cord (80 cubic ft)
11000 square feet (1/2-inch panels) = 0.52083333333333
11000 square feet (1/4-inch panels) = 0.26041666666667
11000 square feet (1/8-inch panels) = 0.13020833333333
11000 square feet (3/4-inch panels) = 0.78125
11000 square feet (3/8-inch panels) = 0.390625
1board feet = 0.0010416666666667
1cord = 1.6
1cord (80 cubic ft) = 1
1cord feet = 0.2
1cross tie = 0.041666666666667
1cubic feet = 0.0125
1cubic inch = 7.2337962962963E-6
1cubic meter = 0.44143333401861
1cunit = 1.25
1pallet = 0.017708333333333cord (80 cubic ft)
1switch tie = 0.065625

Mobile version